A Month Later (17th of October)

12th of October: A/C back for whole building.

**********

Out side of the IES building

Dsc00051.jpg (61046 bytes)

Dsc00052.jpg (61809 bytes)

 

The entrance

Dsc00053.jpg (60620 bytes)

Dsc00054.jpg (77712 bytes)

 

Dsc00055.jpg (63053 bytes)

A month later (avobe), and before (bottom).

Dsc00010.jpg (32954 bytes)

 

The backyard

Dsc00056.jpg (62984 bytes)

Dsc00057.jpg (61606 bytes)

Dsc00064.jpg (62152 bytes)

[New A/C compressure for the 2nd floor's Labs - under the construction]

 

INSIDE

the basement

Dsc00063.jpg (62292 bytes)

Dsc00059.jpg (62722 bytes)

Dsc00061.jpg (59097 bytes)

[ex-Paelo-magne. Lab]

 

Under the re-consrtuction

Dsc00065.jpg (61650 bytes)

[a view from the 2nd floor]